zuops

    AI calling campaigns

    AI that calls your leads back and books the appointment.

    Pick who to call and when. AI Campaigns dial your leads inside your calling window, have a real conversation, book on your calendar and retry the ones who didn't pick up.

    1.5 credits per minute of AI conversation; a voicemail drop is 1 credit. Needs a voice-capable number.

    Loved by 1,300+ businesses

    How it works

    How AI Calling works

    1. 01

      Choose who to call

      New leads, leads who haven't replied, a pipeline stage, or a list you pick.

    2. 02

      Set the window and retries

      Calling hours, how many tries and how far apart, and what to say on voicemail.

    3. 03

      Watch bookings come in

      Every call is recorded and transcribed, and bookings land on your calendar.

    Real conversations

    It talks like your best appointment setter.

    The AI caller uses your script, business details and calendar, handles questions and objections, and books the appointment while the lead is on the phone.

    Retries and voicemail

    Persistence without the busywork.

    Leads who don't pick up get called again on your schedule, with a voicemail left when it makes sense. Calls stop the moment someone books or opts out.

    Speed to lead

    Or ring your own team the second a lead comes in.

    Instant Lead Connect calls your sales rep first, then connects them to the new lead within seconds of the form being filled, so a person reaches every hot lead while it's still hot.

    See it in action

    See AI Calling in action.

    A real screen recording from inside Zuops, no mockups.

    Why AI Calling

    Follow up with every lead, not just the easy ones.

    Calling windows

    Calls only go out during the hours you set.

    Automatic retries

    Try again later without anyone remembering to.

    Voicemail drops

    Leave a message when nobody answers, for 1 credit.

    Books on the call

    Appointments go straight onto your calendar.

    Recordings and transcripts

    Hear or read exactly what was said.

    One brain

    Same business details and FAQ as the AI texting and receptionist.

    Real results

    Real businesses. Real bookings. Real revenue.

    Campaign numbers from owners and agencies who run their ads and leads through Zuops.

    Campaign results for Beauty & Wellness Studio

    400+ new clients for less than a coffee each

    “I'm still shocked we got over 400 new client conversations for less than a fancy coffee each. Their DM strategy didn't just get us bookings, it built a community. Our appointment book has never been this full.”
    Beauty & Wellness Studio
    Beauty Services
    Campaign results for Architecture & Design Firm

    From headache to $13 quality architecture leads

    “Getting qualified architecture leads used to be our biggest headache. They brought in over 200 at a cost of just $13 a piece. The quality of their creative is top-notch. Finally, a consistent flow of real projects.”
    Architecture & Design Firm
    Professional Services
    Campaign results for Home Repair Specialists

    1,000+ leads at $10 each

    “Over 1,000 leads at just $10 a pop? We couldn't believe it. This campaign was a massive success for filling the gaps in our booking calendar during what used to be our slow weekdays.”
    Home Repair Specialists
    Home Services
    Campaign results for Professional Services

    Video campaign delivers 114 leads at $12 each

    “Video is tough, but they nailed it. 114 leads for around $12 each is a number we didn't think was possible. They understood our service model perfectly and delivered creative that actually converts.”
    Professional Services
    Business Services
    Campaign results for Window Cleaning Services

    Local window cleaning gets 14 high-quality jobs

    “We're a local window cleaning biz, so we weren't sure what to expect. They managed to pull in 14 high-quality jobs from a single video campaign. The way they presented our service made us look like the pros we are.”
    Window Cleaning Services
    Home Services

    Pricing

    1.5 credits per minute of AI conversation. A voicemail drop is 1 credit.

    Every plan includes the whole platform, from $19/mo. Usage comes out of your plan's monthly credits.

    See plans and credit prices

    FAQ

    AI Calling: common questions

    Something else? Ask our team

    Is it legal to call leads with AI?

    Rules differ by country and state. Use AI Campaigns to call people who asked to hear from you, like form fills, lead ad leads and customers, honor opt-outs, and check the rules where you operate. This isn't legal advice.

    What number does it call from?

    The phone number on the sub-account. Campaigns need a voice-capable number, which you can buy in the Phone tab or bring from your own Twilio account.

    Can I listen to the calls?

    Yes. Every call has a recording, a transcript and a summary in the call log, attached to the lead.

    What does it cost?

    1.5 credits per minute of AI conversation and 1 credit for a voicemail drop, from your plan's monthly credits.

    Turn ad clicks into booked appointments.

    Start with your own business or bring every client. Your first ads take minutes, and every new lead gets a reply in seconds.

    • Plans from $19/mo
    • White-label on every plan
    • Cancel anytime